Work Description: -precommissioning and commissioning activities(gas turbines, generators, power generators, switch board HV LV, protection relay, transformer, motors and pumps). Loup check.
-Maintenance of all kinds (motors, MCC, UPS, Aero-refrigerant)
- Start motor,5.5kv,400v - Startup power plant GTG turbine gas
(3*18MW) and RGC turbine compressor gas( 5002),
- Maintenance electrical (corrective and preventive maintenance).
-Electrical isolation (A1.A2) (high and medium voltage)
- Cathodic protection system.
-General earthing and grounding system.
-Wiring and connexion of lighting system.
-Lighting installation and connexion
Work Description: -precommissioning and commissioning activities(gas turbines, generators, power generators, switch board HV LV, protection relay, transformer, motors and pumps). Loup check. -Maintenance of all kinds (motors, MCC, UPS, Aero-refrigerant) - Start motor,5.5kv,400v - Startup power plant GTG turbine gas (3*18MW) and RGC turbine compressor gas( 5002), - Maintenance electrical (corrective and preventive maintenance). -Electrical isolation (A1.A2) (high and medium voltage) - Cathodic protection system. -General earthing and grounding system. -Wiring and connexion of lighting system. -Lighting installation and connexion